Software Quality Assurance Plan for GoldSim Models Supporting the Area 3 and Area 5 Radioactive Waste Management Sites Performance Assessment Program (Technical Report) | OSTI.GOV
the maintenance plan.The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for federal fiscal year (FY) 2016. This annual summary report presents results and conclusions of the FY 2016 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2016 include the following: Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2016, Evaluation of new or revised waste streams by special analysis, and Development and acceptance of version 4.200 of the Area 5 RWMS GoldSim PA/CA model. The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2016 review of operations, facility design, closure plans, monitoring results, and R&D results for the Area 3 RWMS indicates no changes that would impact PA validity. The conclusion of the annual review is that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and R&D activities indicates that no significant changes have occurred. The FY 2016 PA results, generated with the Area 5 RWMS v4.200 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. All results remain less than 50% of their performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2016. A new Corrective Action Unit (CAU), CAU 576, with corrective action sites near the Area 3 RWMS and Area 5 RWMS was identified in FY 2016. The sites are currently under investigation and not expected to be important sources for the CA. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter the CAs’ results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Yucca Flat Underground Test Area (CAU 97) source, is scheduled for FY 2024, following the completion of the Corrective Action Decision Document/Corrective Action Plan. Inclusion of the Frenchman Flat Underground Test Area (CAU 98) source in the Area 5 RWMS CA is planned pending the completion of the CAU 98 Closure Report in FY 2017. Near-term R&D efforts will focus on continuing development of the PA, CA, and inventory models for the Area 3 and Area 5 RWMSs.
« less
The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of more »